Tuesday, March 20, 2012

House Tour Part 2 - Bedrooms.

The house drama continues. We found more asbestos (!!!) in the downstairs bathroom that was concealed behind the wall and under the shower. It seems that the shower in that bath was not original to the house like we thought, so the second round of asbestos removal begins this week. Oh joy.

Despite the drama, there is lots of progress which is lovely. The kitchen is coming right along and the cabinets will be delivered later this week. The dishwasher and wall oven/microwave will be here next week and the cooktop the week after, leaving just the refrigerator to be chosen and ordered. We even finalized the kitchen floor tile (you can see the tile here, though we ordered it locally from Smethurst Tile in Burlington for a steal - $2.77/sq. ft.) and decided to wait on a backsplash, since we haven't found one that is just right. I am personally in favor of ordering tiles from Heath Ceramics but I still need to get M on board with this plan...

While the chaos continues and winds down, I am going to continue the house tour with the bedroom level. Enjoy!

Walking up the half-flight of stairs lands you in a small hallway. All of the rooms on this level (except the master bath) open into this landing and the hardwood floors that are on the main level continue throughout the upper level. There is a horrible, huge, square recessed light in the hallway ceiling that can't really be replaced as it is, so we will have the hole patched an a normal size box installed for a new light. Unfortunately, we probably won't be able to make the ceiling finish match in that area, so whatever light we choose will need to be big enough to cover the existing outline. You can't see it in this picture but trust me, anything would be better than this light.

Upstairs hallway.
Landing.

The hall bath is probably the ugliest room in the house, though the master bath and kitchen tie for second place. The tile is an ugly pinky-orangey-taupe non-color and the vanity counter is a pinky-tangerine and really worn. The floor tile defies description and the nicest thing I can say about the whole room is that the tub is in decent shape. We will eventually have to redo this bath, but of the three bathrooms this one is in the best shape so except for a little bit of caulk to repair some tile cracks and removing the in-wall medicine cabinet, we will be leaving it alone for now. Bummer.

Hall bath.
You can't tell here because it was overcast, but the bathroom gets lots of light from the window in the shower.

Hall bath.
Closer view of the vanity...oh my.

Next to the hall bath is a small linen closet and just beyond that is the master bedroom. The bedroom itself is okay...there is one decently sized closet (though how that will work out with us sharing it is still a mystery to me) and great natural light from the windows. On a side note, I am so excited to be moving to a home where every single room has at least one window and most have more.

Master bedroom.
View from entrance. Note the very old window AC unit that was likely an air quality hazard. It has already been removed and in the process we discovered that there was no window behind it. Thanks, previous owners!

Master bedroom.
View into the master bath.

The master bathroom is nothing to write home about. The blue sink, toilet and tile is depressing and why they chose to make every shower in this house even more claustrophobic than they needed to be is beyond me. The floor tile is not in good shape and really needs to be replaced, but we will be band-aiding it for now until we can do a full reno in here. The toilet will likely be replaced before we move in, as it is already loose and I would like to avoid leaks. We will also remove the medicine cabinet in this bath. Unfortunately, even when we get around to doing this bath we can't really expand it, as the size is limited by the hall bath and linen closet so the best we could do is to combine the master and hall bathrooms. We have seen this done, and done well, in a house with our floorplan, but I am nervous about losing a bathroom in the grand scheme of things. We are hoping that living with it for a while will help us make that decision.

Master bath.
Blue.

Master bath.
Tiny shower. This space would be immensely improved if the shower wasn't so closed in from the front and if the ceiling followed the lines of the actual ceiling.

Next to the master bedroom is what I have been calling the purple room. Because it is purple. This bedroom is the same size as the master with a somewhat smaller closet and fewer windows. The AC in this room has also been removed and regaining that window lets in lots more light. All of the bedrooms on this level have at least one hard-wired wall sconce that is switched, and this room and the master have a second sconce that is not switched. We still haven't decided if we will replace the scones or just cover the holes. This will become the Numa's bedroom once it has been de-purpled.

Second bedroom.
From the doorway.

Second bedroom.
You can see the closet and the sconces in this picture. Also notice that for some reason the doors in this bedroom were painted at some point - not only are the closet doors blue, but the back and edge of the main door is blue as well. Really?

The final bedroom on this level is a tiny room - only about 100 sq. ft. It will be the nursery for now, but I envision it becoming my sewing room as soon as the kids are old enough to realize the disparity in their spaces. Unless we have a third and then two of them will share and everyone will have less space! There is yet another outdated AC unit (also already removed) and a small closet.

Nursery.
From the doorway. Tiny.

Nursery.
Looking back at the doorway and the closet.

And that concludes the bedroom tour. Next up is a tour of the downstairs and the basement, but for now enjoy this brief peek at progress. I am so excited to be moving in less than 2 weeks!

 Hall bath
No more medicine cabinet!

Master bedroom
Millions of wall repairs and another missing cabinet.

Be well,

Me

Saturday, March 10, 2012

House Tour Part 1 - Main Level.

Things are happening at the new house. Not as much as we had hoped due to the asbestos issue, but progress nonetheless. We are about to draw to a complete halt, though, until we can get the tile removed from the kitchen and the entire downstairs. Sigh.

In the meantime, I am going to give you a tour of our new house, one floor at a time. Today I am going to focus on the front of the house and the main floor. Enjoy!

The house is currently painted a sick looking brown/tan color. It either has too much pink or too much yellow depending on the light and the angle at which you look. The exterior lighting is both boring and not bright enough. One section of siding underneath a living room window was replaced at some point and neither the type of siding nor the paint matches. Lovely. The landscaping (what little there is) is a mess and at least one tree needs to be removed. All this to say...the exterior needs work. Eventually, we will get around to that.

Front of house 
Our new abode.

Deck
See the mismatched siding?

The entry way has a small coat closet which abuts the back of the fireplace. When we bought the house there was an odd, too-large shelf affixed to the left wall that was apparently made of stones from a Chinese monastery. Thankfully, the sellers wanted to keep it and it went to France with them. Straight ahead you can just see the centrally located stairs (that either lead down to the lower level or up to the bedroom level) and the door into the kitchen. The tile in this area is slate and I wish we could match it for the kitchen, but that seems unlikely.

Foyer
Looking into the kitchen.

Foyer
Looking at the front door.

The living room is large and has lots of windows. The fireplace is the main focal point and we can't wait to spend time in this space. The walls all need to be patched and repainted and eventually we need to reline the chimney and replace the can lights. All in all, though, this room is in great shape and one of the reasons we love the house.

Living room 
Fireplace.

Living and dining rooms
Windows onto the deck and entrance to the dining room.

Adjoining the living room is the expanded dining room that is on the back of the house. It also has lots of windows and is large enough that I hope to fit a breakfast nook into the far end. The addition has sunk a bit, but it seems to be due to typical movement and not related to stability issues. The can lights and chandelier need to be replaced and it needs a fresh coat of paint, but otherwise this room is pretty good.

Dining Room
Dining room.

The kitchen has two entrances: one from the foyer and one from the dining room. They both had doors when we bought the house but we have already removed one and the other is also leaving. I could give you lots of details about the issues in this room, but suffice it to say that from the magenta wall (???) to the late 80's vintage dishwasher, this room is a hot mess.

Kitchen 
View from corner (the doorway on the left leads to the foyer).

Kitchen
View from the corner again (the doorway on the right leads to the dining room). Note how the range is offset from the hood by a good 8 inches.

Kitchen
Don't you just love that pink wall?

Our original plan for the kitchen was to remove all of the cabinets and countertops, the sink and the dishwasher and to keep the current fridge and range. After discovering that the tile had asbestos and we would essentially have to gut the kitchen, we decided to go all in and start with new everything. The full list of items for the kitchen remodel now includes:

1. Opening both doorways to allow better flow through the room. The opening from the foyer will probably only widen by a few inches but the opening into the dining room will extend from the front of the cooktop cabinet to the front of the wall oven cabinet. I will post a rendering of the new layout soon and this will make much more sense.

2. Updating the existing electrical to bring it up to code (which means installing GFCI outlets) and adding can lights and a pendant over the sink. We are also going to add under cabinet lighting.

3. Replacing the asbestos tile floor (which will be abated by a local company) with slate or porcelain tile.

4. Replacing all appliances. We are going to install a wall oven/microwave combo and an electric cooktop instead of a one-piece range and put in a new dishwasher, all from Bosch. The range hood is from IKEA. We have yet to pick a new fridge because it is hard to find a counter-depth fridge that is rated well but has no ice maker/water dispenser in the door.

5. New cabinets, countertops, sink and faucet, all from IKEA. We were thrilled to find out about the 20% off kitchen sale at IKEA and managed to save a ton of money, essentially getting the range hood for free!

6. A glass tile backsplash. I wasn't completely sold on glass tile at first because none of the edging options appealed to me. But then somone (thanks Mom!) managed to find a bullnose edge finishing tile which solved the problem. Hurray!

7. New paint.

And that wraps the main level. Next up: bedrooms!

Be well,

Me

Sunday, March 4, 2012

DIY Ribbon Loop blanket.

I'm back. Here is the very long post talking about my method for making ribbon edged blankets for kids. Enjoy!

The projects I completed tonight were identical and were based on a project I have actually made several times previously. My son, like most small kids, is obsessed with tags. Give him any plush toy and he will immediately locate and begin to twist the tag. He loves them and has for quite a while. One of his teachers at daycare mentioned that you could buy a toy that was nothing but tags online but after I looked them up, I couldn't bring myself to pay what I considered an exorbitant amount of money for less than $3 worth of materials. Additionally, their printed ribbons were wicked tacky. The basic small blanket ringed with ribbons seemed like an easy project so I used some of the "minky" fabric (I loathe that word, but it is the most recognized description of this fabric) I had on hand plus some brightly colored quilting cotton I bought with a coupon at Jo-Ann. (Aside: I never shop at Jo-Ann or Michaels or any of those similar stores without coupons - 40% off is the bomb, people.) I also used part of my large stash of ribbon and some additional ribbon I got at a local craft store (Playtime, for any Arlington peeps - they have a great ribbon selection, btw). Below I describe my method for making the small blanket. You can easily churn this out in an hour or less if you have all the necessary materials on hand.

1. Cut two equal sized squares from a minky fabric (or any soft textured fabric, really, as long as it would be comfortable for little hands to explore) and a quilting weight cotton (I will sometimes use more than one cotton fabric and create a quilting square to mix colors and patterns). For the small blanket I use a 12-14 inch square, which is small enough for baby hands to carry and large enough to showcase most fabric patterns. I am not terribly particular about my final measurements, but if you are, read through the directions and do the appropriate math to account for seam allowances.

2. Cut 4 inch lengths of ribbon and lay them out at regular intervals along the perimeter of the right side of your quilting cotton until the arrangement is pleasing to you. I typically do 4 to 5 ribbons per side and try to make sure that the colors are evenly distributed. If you are using a cotton fabric with a regular pattern it is nice to line up the ribbons with the pattern.

3. Once you have a pleasing layout for the ribbons, fold each ribbon in half to create a loop and pin the loop to the previously chosen location on the right side of your quilting cotton. The ends of the loop should overhang the edge of the fabric by about 1/4 of an inch. See the picture below for an illustration. Continue pinning the ribbons in this way until all ribbons are attached to the cotton, making sure that the ends of the loops are pointing away from the center of the fabric.

Ribbon blanket.

4. Stitch all the way around the perimeter of the quilting cotton with a 1/4 inch seam allowance. This will attach the ribbon loops to your fabric and eliminate the need for pins to hold the loops in place in the next step.

5. Place your minky square and your cotton square right sides together and pin around the perimeter. Make sure that your ribbons (which should be securely attached to your quilting cotton - did you do step 4?) are tucked neatly inside so that you don't have to pick out a ton of freaking stitches after you accidentally sew part of a ribbon loop into the edge.

6. Sew around the perimeter of the fabric sandwich with a 1/2 inch seam allowance, leaving a 2 inch opening in the middle of one side. I like to sew with the cotton on top, because I think my machine sews it better that way, but either way you align it make sure that you are catching both fabrics and all ribbon ends in your stitching and that you leave a 2 inch opening on one side to enable turning the blanket right-side-out. I mark the area I'm not going to sew with two closely spaced pins so that I don't forget. Back-stitch on both sides of the opening to protect your stitches during the turning process.

7. Clip your corners, being careful not to cut through your stitching. Even up any rough edges and cut off any overhanging ribbon edges (or don't...all of this will be encased in the blanket and won't show, so if you don't feel like doing this step, it is a-ok with me). Turn your blanket right side out and use a pointed object to push out the corners. I use a metal chop stick. Pin the area around the hole to close the blanket.

8. Top stitch all the way around the blanket with a matching or contrasting thread, depending on your desired look. Make sure that the top stitching completely closes the hole you left for turning and tug all ribbons to ensure that they are securely attached. Remember, this is for a baby!

The nice thing about these blankets is that they are super portable and lightweight and the ribbon loops give you tons of places to secure a toy strap, making it harder for your little one to Hans Gruber* it. I have given several of these as gifts and made a couple for my little guy and they seem to go over well. They are easy to customize to individual color preferences and washable to boot. The Numa's current favorite toy is a dinosaur with ribbons for spikes (named Bacon...my son is so cool), so one of my future projects will be a plush toy with ribbons.

**If anyone does read this and use the tutorial, please know that the manufacturers of the original product in no way contributed to this tutorial and they do not authorize anyone to use this tutorial to sell this or similar products. From what I understand, they don't look too kindly on that sort of thing either. So, don't use this to sell these things, k? Personal use only.**

*When the Numa was a baby, he would randomly drop or sometimes throw things on the floor, which my husband and I started referring to as Hans Grubering. You know, like when John McClane throws Hans Gruber (oh, Alan Rickman, how I love you) off the roof in the first Die Hard? Anyway, it stuck and now we use it for anytime someone throws something onto the ground. Stick around, people. It's going to be a thing. And these pretzels are making me thirsty. I clearly need to go to sleep.

Happy Weekend!

Be well,

Me

(This was originally posted on July 30, 2011 but I am re-posting to move to the top of the blog.)

Friday, February 24, 2012

Wop wop.

And of course, the tile is asbestos. Cue the woe and dollar signs. Sigh. Well, this will cost us a little more and push back the timeline, but fortunately we don't currently have any possessions in the house so it will be much easier to remediate than it would be after we moved. Plus, the ugly floor in the downstairs bath has to go! Optimism FTW!

Be well,

Me

It begins.

As delighted as M and I are with our new house, we are finding out bit by bit that what we really bought is an opportunity to spend lots more money. Every time we start on one project, we find two more that need to go on the list. Alas, we cannot afford to tackle everything at once, so we are starting with the two things that emerged at the top of that very long list: painting the entire house and remodeling the kitchen.

Almost every wall, ceiling and closet in the house is in desperate need of a paint job. I don't know when it was last painted or by whom, but all of the off-white paint is dingy and depressing, and even that isn't as bad as the lavender in the second bedroom or the horrible china blue in the downstairs guest room. There are literally hundreds of holes in the walls of various sizes and the hardware holding the rolling blinds in place has been painted over at least 5 times, rendering it almost part of the wall. One wall downstairs has water damage behind the plaster, which makes the paint chip off in charming little geometric shapes and the windows in the bathrooms are all edged with rust. Thankfully, we found a contractor whose painters seem up to the job and they started prep work on Wednesday. All the floors we care about are covered in pink paper and the long process of removing a million wall anchors is begun. Hooray! We are having the entire house painted the same color: Benjamin Moore's Distant Gray in their no-VOC Natura paint and primer. With a 2 year old and a little one on the way, we want to be as health conscious as possible. We may go back and do some accent walls in different colors later, but for now we are going with a clean slate.

The second item on our pre-move-in list is the kitchen. And oh my, does it need help. The cabinets, countertops and (I think) sink are original, and the dishwasher is of a late 1980's vintage. The range hood is offset from the actual range by about 8 inches and the automatic ice maker isn't even connected to a water source. Not to mention the awful tile floors, which may or may not contain asbestos. (Fingers crossed that we don't have to do asbestos remediation before commencing work.) So, we are going to essentially start over. Both doorways are going to be widened to open the space and we are installing all new cabinets, floors and countertops, as well as replacing the sink, faucet, dishwasher and range hood. The refrigerator and range are both new-ish and will remain until I can find an awesome deal on the range of my dreams (found here; my mom has the same one and I love cooking on it and so does she). Ditto for a counter-depth refrigerator, but since I don't want an icemaker/water dispenser in the door this is actually a harder search than I expected. The good news about the kitchen is that the contractor's estimate came in right where we anticipated and so far, we are within our budget! We are planning to do an IKEA kitchen and the very first thing I chose for the space was the DOMSJĂ– double-basin farmhouse sink. I LOVE IT. The very thought of having enough space to wash pots is enough to make me dizzy. We are going to pair it with the HJUVIK faucet with hand sprayer. The cabinet and drawer fronts will be the NEXUS birch veneer with LANSA handles. M used the IKEA kitchen planner to lay out all of the cabinets and we are pretty much ready to buy everything, but rumor has it that the semi-annual kitchen sale begins in March so we are waiting to see if we can get another 20% off. We still need to choose a dishwasher (leaning towards a Bosch but they have less interior space due to better sound-proofing), flooring (likely either slate or a porcelain tile that looks like slate), a countertop material (laminate or Caesarstone) and a backsplash material (thinking glass subway tiles in a sea-glass green color). The walls will be white to match the rest of the house.

We will probably give the contractor the green light as soon as we get good news (please, please, please) from the asbestos test results and hopefully will be starting work in the kitchen by the first full week of March. It's getting exciting...

Be well,

Me

Sleepover kit planning.

Sleepovers are fun. I can remember how much I loved both having and going to sleepovers as a child and hope that one day, our new home (!!) can be the site of many awesome all-night giggle fests. Even though my little friend MK isn't quite ready for big girl sleepovers, I think that having a kit of the necessary supplies will help her to prepare.

Admittedly, the only progress I have made is to map out my plan and purchase anything that I didn't already have. Oh, and all the fabric is washed thanks to the mister. I decided to start with the pajamas and let them guide my color choices. Since the pants of the PJs are pink with monkeys, I decided to coordinate with the pinks and browns. I chose the following fabrics:

- Bubblegum pink fleece, which matches the bows and hearts on the PJs
- Hot pink/white flannel houndstooth print
- Hot pink flannel-backed satin
- Brown minky fabric (which I already owned)
- A medium weight blue denim

It sounds like too much, but bear with me and I think you will see where I am going with this. This is the breakdown of what will be used where:

1. Pajamas - I found some adorable PJs at Carter's (on sale!). You can see them here, but just in case the link expires, they are pink, flannel and have monkeys on them (MK loves monkeys).

2. Blanket - I am going to make a simple blanket with the brown minky on one side and the pink flannel-backed satin on the other. For the edging I am going to make bias binding with the pink/white houndstooth using this tutorial.

3. Pillow - A toddler sized pillow with a simple pillowcase using the pink/white houndstooth.

4. Slippers - Bubblegum pink fleece elf slippers using the maya*made tutorial found here.

5. A sleep mask - Pink flannel-backed satin and pink/white houndstooth using this Whipup tutorial.

6. A toothbrush and toothpaste - I still need to pick up a toddler toothbrush and some toothpaste at Whole Foods.

7. A stuffed animal - If I have time, I am going to make a bunny similar to this one with either the pink flannel or the brown minky. Either way, I will line the ears with the pink/white houndstooth.

8. A bag - I made some simple, reversible drawstring bags for the Numa and my niece and nephew over the holiday. I will use the same pattern for this bag with the denim and the flannel-backed satin and will post a short tutorial on making the bags, since they are cute and sturdy. Below is the bag I made for my nephew...the train fabric is a Kokka medium weight cotton/linen blend I found at a local fabric store. The bag reverses to a dark denim and the bottom of the bag on each side is in the contrasting color.

Elliott's fort kit.

Wish me luck. I have a long list of projects and a limited timeline!

Be well,

Me

Tuesday, February 7, 2012

All your brain cells are belong to me.

We have news! I am currently about 18 weeks pregnant with baby #2. M and I are thrilled and can't wait to welcome a new baby into our family. The Numa will be roughly 2.5 when the new baby comes and will hopefully be very excited to be a big brother. I am almost giddy at the thought of another tiny person who sleeps on my chest and has that new baby smell. Isn't that just the best?

While I am very happy to be expecting a new baby, I am growing increasingly concerned about my inability to function in what I consider a "normal" fashion. You know, where I remember to do things and can recall simple words and concepts during conversations. The other day, I was telling a coworker about a new show I was watching on __. It took me almost 10 seconds of thought to fill in that blank, which was "television." That's right, TELEVISION. TV. I could not remember the word for that big square thing on which I watch shows. In the main, this isn't such a huge deal. Sure, I take my fair share of teasing for the resulting ridiculousness, but hey, that's life. However, tonight my non-functional recall ability caused me to forget our monthly meat CSA pick up. Which takes place approximately 5 minutes from our apartment. By foot. Like I could have walked there at any time after arriving home up to about 6:45 and still made it in plenty of time to pick up my share and chat with the lovely farmers who provide it. The cooler was even in the car...I could have stopped on my way home. And I read the email reminding me to pick up my share right before leaving work. But no, my fetus-eaten brain failed to remind me that I needed to do this until a full hour after pick up had ended. Damnit.

In other news, we closed on our new house last Friday! We went to the house after the closing to make a list of what needs to be done before we move in late March and one of our neighbors rang the bell to say hello. Our new neighborhood is fantastic - we have met several of our neighbors and each is nicer than the last. There are several families with kids and a family expecting a new baby sometime this spring, so at least one of our little people will have similarly aged pals to hang out with. I will post lots of pictures of the house in it's current state. There is much to do!

Be well,

Me